What electrical coordination means on our jobs
Electrical work is performed by the project electrician. Our role is everything around it that keeps the job moving: framing that's ready for the electrician's layout, sequencing so rough-in happens at the right time, and making sure walls and ceilings stay open until the rough-in inspection is complete. On a restoration job or a renovation with several trades, that coordination is often what separates a smooth schedule from a stalled one.
Rough-in support
- Framing for the layout. Blocking, backing and framed openings where the electrical plan calls for boxes, panels and fixtures.
- Scheduling. Rough-in planned between framing and insulation so trades aren't waiting on each other.
- Access. Clear, clean work areas for the electrician, with debris removed.
- Inspection timing. Insulation and drywall held until rough-in is inspected.
- Documentation. Photos of open walls before close-up for your file.
Why it matters on restoration work
On water and fire losses, wiring in damaged areas often has to be evaluated by an electrician once walls are opened. When the rebuild team and the electrician aren't coordinated, walls get closed too early or sit open for weeks. We keep the electrician in the loop from demo forward so their work fits the reconstruction schedule.
Who we coordinate for
General contractors, restoration companies, property managers and investors rely on us to keep multi-trade interiors moving. We coordinate with the electrician on the project team, and we work alongside trusted partners to deliver projects of every size.
What to send us
Send the scope, the electrical plan or fixture layout if there is one, the electrician's contact and availability, and any inspection requirements. We'll build rough-in timing into the schedule and into our written proposal.